Telephone
0 531 686 18 18
Hartha Unit-1 Rehabilitation project consists of rehabilitation of instruments and control system of turbine and boiler, rehabilitation of generator and electrical equipments, rehabilitation of boiler runs on 4 types of fuel, rehabilitation of turbine and increase the output of generator to its original value 200 MW and extend the lifetime of the boiler, turbine and generator to 10 years.
Array
Gölbaşı / Ankara / TÜRKİYE
0 531 686 18 18
oben.m@alsenergy.com.tr
0200 000 00 00